Biogas Industry Resources
Case Studies, Articles & More - Get to Know Us!
![Bigoas Upgrading - Engineering EPC](https://www.esisolutions.com/hs-fs/hubfs/Bigoas%20Upgrading%20-%20Engineering%20EPC.jpg?width=1400&height=788&name=Bigoas%20Upgrading%20-%20Engineering%20EPC.jpg)
Biogas-to-RNG
Case Study: Biogas-to-RNG Facility - Design, Build, Operate
![CASE STUDY- Biogas-to-RNG - Foothills - COVER](https://www.esisolutions.com/hs-fs/hubfs/CASE%20STUDY-%20Biogas-to-RNG%20-%20Foothills%20-%20COVER.png?width=1114&height=1410&name=CASE%20STUDY-%20Biogas-to-RNG%20-%20Foothills%20-%20COVER.png)
Biogas-to-Energy
Case Study: Facility Engineering & Design
![ESI Case Study - COVER - Biogas Processing - Engineering - Biogas-to-Energy - LFGTE](https://www.esisolutions.com/hs-fs/hubfs/ESI%20Case%20Study%20-%20COVER%20-%20Biogas%20Processing%20-%20Engineering%20-%20Biogas-to-Energy%20-%20LFGTE.png?width=510&height=645&name=ESI%20Case%20Study%20-%20COVER%20-%20Biogas%20Processing%20-%20Engineering%20-%20Biogas-to-Energy%20-%20LFGTE.png)
LFG GCCS • O&M
Case Study: LFG-to-Energy Facility O&M
![ESI Case Study - CASE STUDY- LFG-TO-ENERGY OPERATIONS & MAINTENANCE FOR A 4.8 MW FACILITY COVER](https://www.esisolutions.com/hs-fs/hubfs/ESI%20Case%20Study%20-%20CASE%20STUDY-%20LFG-TO-ENERGY%20%20OPERATIONS%20%26%20MAINTENANCE%20FOR%20A%204.8%20MW%20FACILITY%20COVER.png?width=1114&height=1410&name=ESI%20Case%20Study%20-%20CASE%20STUDY-%20LFG-TO-ENERGY%20%20OPERATIONS%20%26%20MAINTENANCE%20FOR%20A%204.8%20MW%20FACILITY%20COVER.png)
AD Gas to RNG
Digester Gas to RNG Facility Engineering & Project Mgmt.
![ESI Case Study - COVER - LFG FINAL 5 copy-3](https://www.esisolutions.com/hs-fs/hubfs/ESI%20Case%20Study%20-%20COVER%20-%20LFG%20FINAL%205%20copy-3.png?width=1114&height=1410&name=ESI%20Case%20Study%20-%20COVER%20-%20LFG%20FINAL%205%20copy-3.png)
LFG-to-Energy
Case Study: Off-Grid LFG-to-Energy with Microgrid
![CASE STUDY- LFG-to-Energy - Project Development - Engineering & Project Management - booklet COVER - LFG FINAL copy 4](https://www.esisolutions.com/hs-fs/hubfs/CASE%20STUDY-%20LFG-to-Energy%20-%20Project%20Development%20-%20Engineering%20%26%20Project%20Management%20-%20booklet%20COVER%20-%20LFG%20FINAL%20copy%204.png?width=1114&height=1410&name=CASE%20STUDY-%20LFG-to-Energy%20-%20Project%20Development%20-%20Engineering%20%26%20Project%20Management%20-%20booklet%20COVER%20-%20LFG%20FINAL%20copy%204.png)
Biogas-to-RNG
CASE STUDY: RNG Facility Design Services
![ESI RNG Case Study - COVER - FINAL_800](https://www.esisolutions.com/hs-fs/hubfs/ESI%20RNG%20Case%20Study%20-%20COVER%20-%20FINAL_800.png?width=800&height=1013&name=ESI%20RNG%20Case%20Study%20-%20COVER%20-%20FINAL_800.png)
LFG GCCS & Flare
Case Study: LFG GCCS & Flare System Design
![ESI RNG Case Study - Landfill Gas Collection - GCCS - & Flare System Design - COVER - 800-1](https://www.esisolutions.com/hs-fs/hubfs/ESI%20RNG%20Case%20Study%20-%20Landfill%20Gas%20Collection%20-%20GCCS%20-%20%26%20Flare%20System%20Design%20-%20COVER%20-%20800-1.png?width=800&height=1013&name=ESI%20RNG%20Case%20Study%20-%20Landfill%20Gas%20Collection%20-%20GCCS%20-%20%26%20Flare%20System%20Design%20-%20COVER%20-%20800-1.png)
Biogas-to-RNG Solutions
Flip Book
![ESI - Biogas-to-RNG flip book](https://www.esisolutions.com/hs-fs/hubfs/ESI%20-%20Biogas-to-RNG%20flip%20book.png?width=600&height=474&name=ESI%20-%20Biogas-to-RNG%20flip%20book.png)
Designing the Future of Your LFG GCCS
A Strategic Approach
![Operator working on a Landfill Gas Collection System](https://www.esisolutions.com/hs-fs/hubfs/Operator%20working%20on%20a%20Landfill%20Gas%20Collection%20System.jpg?width=1000&height=667&name=Operator%20working%20on%20a%20Landfill%20Gas%20Collection%20System.jpg)
ESI in Action
View our recent projects - and get a glimpse of our early days!
Biogas-to-RNG
ESI recently completed two NC Biogas-to-RNG projects in partnership with Duke Energy, designated Foothills Renewables & Upper Piedmont Renewables.
See these projects in process here and below!
Learn more here.
Project Gallery
Get to Know ESI
Like what you see?
Work with ESI