Landfill Renewable Natural Gas Facility Design

Landfill Renewable Natural Gas Facility Design

Landfill RNG Facility Design

Recently, ESI completed engineering for the Eagle Point Landfill, delivering 3D design and construction plans for: 

  • Full suite of engineering services provided
  • Managed 6,000 scfm of raw landfill gas
  • Utilized Air Liquide Membranes & Pretreatment
  • Employed Guild PSA System & Dehydration Unit
  • Used Glauber & Sullivan Compression

For more information download our FREE Case Study below:

Eagle Point Shadow-1

 

 

 

 

Off-grid LFG-to-Energy, Utilizing a Microgrid

Off-grid LFG-to-Energy, Utilizing a Microgrid

Off-grid LFG-to-Energy, Utilizing a Microgrid

Read More
LFGTE Expansion

LFGTE Expansion

LFGTE Expansion Project

Read More
Full Scope LFG Renewable Natural Gas Facility

Full Scope LFG Renewable Natural Gas Facility

Full Scope LFG Renewable Natural Gas Facility

Read More