LFGTE Expansion

LFGTE Expansion

LFGTE Expansion Project

ESI provided EPC services to double the Flathead County landfill's power generation capacity, adding 1.6 MW with a 3520 CAT engine. This included:

  • 1.6 MW generating capacity expansion with 3520 CAT engine installation
  • Blower skid installation and existing building expansion
  • Overcoming labor market challenges through strategic partnerships
  • Services included EPC, process, mechanical, structural, and electrical design

For more information download our FREE Case Study below: