LFGTE Expansion Project
ESI provided EPC services to double the Flathead County landfill's power generation capacity, adding 1.6 MW with a 3520 CAT engine. This included:
- 1.6 MW generating capacity expansion with 3520 CAT engine installation
- Blower skid installation and existing building expansion
- Overcoming labor market challenges through strategic partnerships
- Services included EPC, process, mechanical, structural, and electrical design
For more information download our FREE Case Study below: